Pace is easy to come by now. The right direction is harder.

When you’re briefing an agency, a short timeline often raises questions. But whether speed helps or hurts the outcome depends on what, and who, is steering it. Making things has never been faster. Working out what’s worth making still takes time, and it’s the part most likely to be skipped.
Put two agency proposals side by side. One scopes eight weeks, the other four months, for what looks like similar work. The question about the shorter one is usually the same: what’s being left out?
It’s a valid instinct. Most people who have briefed strategic or creative work have lived through a rushed job. The strategy reads like the brief handed back, the concept doesn’t align with the audience.
The ground has shifted, though. Producing drafts, options, visuals and analysis is faster than it has ever been, for every agency. Pace is widely available now, so on its own it tells you very little. What it does is amplify whatever approach sits underneath. A well-run project reaches the right answer sooner. A poorly run one reaches its mistakes faster, with more polish on them, which makes them harder to spot.
None of this is an argument for slowing everything down. Moving quickly is necessary given the pace of the market. But it must be pointed in the right direction.
A Formula 1 pitstop takes about two seconds, and no one watching assumes the tyres are on loosely. The speed is the visible result of what happened beforehand. Roles are defined, the sequence is set, and the people involved have the years of experience to know exactly what to do.
Good fast projects work the same way, and there are four things underneath all of them:
- Time to understand the problem before anything is made
A short, focussed diagnosis at the start tests the brief against stakeholders, audiences and the market. It’s the most efficient and cost-effective time in a project to shift course if needed. Once the real problem is clear, the right response isn’t too far behind. - Success agreed before the work begins
When everyone knows what the work needs to achieve, each option can be judged against it. A long list of concepts quickly narrows to the few that address the problem. - Structure that keeps the thinking in view
Defined phases, each ending with work the client can see and a decision they’re part of, keep a fast project anchored. Ideas are tested against what the organisation knows while they can still change. - Experienced people making the calls throughout
Producing options is now the easy part. Judging which one is right, and knowing when none of them are, takes experience. That judgement is worth most when the people who diagnosed the problem stay on to shape the work and answer for the result.
The test for any agency is simple. Ask how much of the timeline goes into working out the problem, and who does that work. If the answer is very little, or someone you won’t meet, most of the speed is in the making. It’s why our directors test the brief and find the real problem before the work scales up. Technology can supply the pace. It takes experience to find the right direction. With both in place, fast and good stop being a trade-off.